Land clearing removes what is on and in the ground: brush, trees, stumps, roots and organic soil. Grading reshapes the ground itself, moving and compacting soil to set pad height and drainage. In Palm Coast, grading follows an engineer’s plan and can need its own permit. Sunward Palm Coast Land Clearing handles the clearing and grubbing, and we hand over a clean footprint for the grading that follows.
In short
- Clearing and grubbing: vegetation, stumps, roots and organic soil out.
- Grading: fill, compaction, pad height and drainage shaped to a plan.
- Palm Coast: grading and drainage plan by a Florida PE; rear drains to front.
- Heavy equipment regrading needs a lot regrading permit; final grading certified from July 1, 2025 permits.
Side by side
| Clearing and grubbing | Grading | |
|---|---|---|
| Purpose | Remove vegetation and organics | Shape the ground and its drainage |
| Removes or adds | Removes trees, stumps, roots, organic soil | Adds, moves and compacts soil |
| Plan it follows | Survey with trees kept and removed | Engineered grading and drainage plan |
| Palm Coast permits | Lot clearing permit, tree permit | Part of the home permit; lot regrading permit for heavy equipment |
| Who usually does it | Clearing contractor | Site work or excavation contractor |
Where clearing stops
Our clearing ends with the footprint grubbed down to clean, light sand: every stump and root mat under the slab, driveway and utility runs pulled, the dark organic layer stripped, and the material hauled or spread away from the building area. That is the ground the grading starts from. Clearing and grubbing covers how it is done, and what land clearing includes covers the items that vary.
We leave stump holes open or rough-filled for the site crew, because filling and compacting them properly is part of the grading, not the clearing.
Coordinating with a builder?
Send the plan; we finish the clearing to the point the site work starts from.
Where grading starts
In Palm Coast, a new home needs a grading and drainage plan from a Florida professional engineer. For most properties the rear yard must drain to the front roadside swale, and grading may not flood or drain onto adjacent properties. The swale and culvert follow a plan the city’s engineering staff design from the survey. A lot regrading permit is required if heavy equipment such as graders, dozers or skid steers is used to regrade, and vacant lot grading needs a sealed topographic survey. For permits applied for from July 1, 2025, the final lot grading and drainage is certified.
Grading usually brings fill: the pad is raised so the slab sits above the surrounding ground and water runs away from it. That fill goes onto the grubbed sand, which is why buried roots and organic soil have to be gone first.
Why the line matters
Mixing the two up is how quotes stop matching. A clearing quote that seems high may include rough grading; one that seems low may leave the stumps in the footprint for someone else. Knowing where the line falls lets each contractor price their part, and lets the owner see whether anything has fallen between them. The after clearing guide covers what happens between the two, and the guide to clearing a lot to build puts both in the overall sequence.
A worked sequence
On a typical new Palm Coast home the sequence runs: house permit issued, lot clearing and tree permits, silt fence up, brush cleared and the trees in the plan felled, the footprint grubbed to clean sand, then the hand-off. The site work crew brings fill, compacts the pad, cuts the drainage toward the front swale to the engineer’s plan, and the culvert goes in. Sod, including bahia in a disturbed swale, comes with the landscaping, and the final lot grading is certified. Each step has a clear owner, which is what keeps the quotes clean.
Grading near keepers
Fill placed over the roots of a tree you kept can kill it as surely as a machine driving over them. When a keeper sits where the grading plan raises the ground, we raise it with your builder before clearing, as the selective clearing page explains.
Grading on acreage
On larger parcels outside the city, the homesite and driveway are graded and the rest left natural. Leaving the woods and mulched areas ungraded keeps runoff and erosion down. The acreage clearing page covers how clearing is split on those parcels, and stumps at the edges are usually ground below grade rather than graded over.
Need the clearing ready for your site work?
Send the site plan and the builder's schedule; the hand-off is planned with the grading in mind.